A daily forum documenting the facelift of our experiential education arena.

Tuesday, December 13, 2005

Face-Off

Construction begins 1.9.06
be here...

Pre-Overhaul Arena Photos

Three camera angles document the arena:


The ALC Arena as of 12.13.05

Tower Cam
Taken from atop the 38’ east tower looking down upon the arena

________________________________

Y-Cam

___________________________________

Z-Cam

___________________________________

The Renovations

Our experiential education arena overhaul will include tearing down the existing:

  • two static ropes courses
  • two towers courses
  • rappel tower
  • two 20' climbing walls
  • 12' initiative wall

Pretty much everything viewable in the Tower Cam & Z-Cam photos!



The only existing tool that will not be taken out is our 32' climbing cave area called The Grotto. (Our Z-Cam is located in The Grotto, at the south-west corner of the arena) When the arena is completed it will be the new home of:
  • two new, static ropes courses
  • two giant's ladders (dango duo's)
  • a second 32' climbing area
  • rappel tower
  • a pamper pole
  • flying squirel
  • vertical play pen
  • 12' initiative wall
  • equipment shed